Southeast-Brookside Combined Sewer Separation Project

Project:

Southeast-Brookside Combined Sewer Separation Project
Evansville, Indiana

Owner:

Evansville Water & Sewer Utility

Contract Amount:

$24,000,000

Description:

This project was to separate storm and sanitary sewer and alleviate flooding on the southeast side of Evansville. Due to the large diameter of the trunkline and the depth, entire city streets were reconstructed in some areas of the project. Project highlights include...
  • 5,800' of 96" diameter RCP storm sewer - up to 26' deep
  • 3,700' of 84" RCP storm sewer
  • 13,300' of 72"-12" RCP storm sewer
  • 254 storm sewer structures
  • 280' of 84" RCP was tunneled under four lanes of US Highway 41
  • 12,600' of 16"-4" water main
  • 6,500' of 24"-8" sanitary sewer
  • 54 sanitary sewer manholes