Toyota Trinity Storm Water Park – Phase II
Project:
Southeast-Brookside Combined Sewer Separation ProjectEvansville, Indiana
Owner:
Evansville Water & Sewer UtilityContract Amount:
$10,000,000Description:
The project consisted of three divisions: a storm water collection system, a subsurface detention basin, and water main replacement. The work included the design and construction of a cast-in-place concrete junction box, storm sewer pipe up to 36” in diameter and 16 feet deep, water main pipe up to 20” in diameter, and a 66,082 cubic feet HDPE chamber system.


