BBI acted as the general contractor on this project and self-performed the traffic control, demolition, excavation & grading, subgrade stabilization, storm sewer, water utilities and stone base. The work included the installation of more than 20,000 feet of storm, sanitary, and water lines. More than 1 mile of this was a 30” diameter storm water force main.